Difference between revisions of "IBHLink S7++:Time Synchronisation with NetPro"

From IBHsoftec Wiki English
Jump to: navigation, search
Line 18: Line 18:
 
The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.
 
The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.
  
[[Image:MPI_Adress.png‎|537px]]
+
[[Image:MPI_Address.png‎|537px]]
  
 
[[Image:Ethernet_address.png‎‎|548px]]
 
[[Image:Ethernet_address.png‎‎|548px]]

Revision as of 16:00, 10 December 2012


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with NetPro

Within IBH Link setting Routing has to be activated :

IBH Link Routing eng.png


The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI® or Profibus with the PLC. MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2

Netpro.png

The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.

MPI Address.png

Ethernet address.png

Stellen Sie sicher, dass der angegebene NTP(Network Time Protocol) Server erreichbar ist:

NTP Address.png


Die Synchronisation muss <auf MPI> als Master aktiviert werden:

537px

In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:

537px

Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen:

761px