IBHLink S7++:Time Synchronisation with NetPro

From IBHsoftec Wiki English
Jump to: navigation, search


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with NetPro

Within IBH Link setting Routing has to be activated :

IBH Link Routing eng.png


The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI or Profibus with the PLC.

MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2

Netpro.png

The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.

MPI Address.png

Ethernet address.png

The selected NTP(Network Time Protocol) Server must be reachable.

NTP Address.png


Set the Synchronisation <On the MPI> to Master:

Clock Master.png

Within the properties of the networked PLC you have to set up the synchronisation as follows:

Clock Slave.png

The Network project needs to be loaded in the IBH Link S7++/ IBH Link S7++HS and the networked PLC:

Download stations.png