IBHLink S7++:Time Synchronisation with NetPro: Difference between revisions

From IBHsoftec Wiki English
Jump to navigation Jump to search
No edit summary
No edit summary
Line 12: Line 12:
The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI®
The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI®
or Profibus with the PLC.
or Profibus with the PLC.
MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2
MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2


Line 31: Line 32:
[[Image:Clock_Master.png‎|537px]]
[[Image:Clock_Master.png‎|537px]]


In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:
Within the properties of the networked PLC you have to set up the synchronisation as follows:


[[Image:SCPU_Slave.png‎|537px]]
[[Image:Clock_Slave.png‎|537px]]


Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen:
The Network project needs to be loaded in the IBH Link S7++/ IBH Link S7++HS and the networked PLC:


[[Image:Station_laden.png‎|761px]]
[[Image:Download_stations.png‎|656px]]

Revision as of 14:08, 10 December 2012


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with NetPro

Within IBH Link setting Routing has to be activated :


The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI® or Profibus with the PLC.

MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2

The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.

The selected NTP(Network Time Protocol) Server must be reachable.


Set the Synchronisation <On the MPI> to Master:

Within the properties of the networked PLC you have to set up the synchronisation as follows:

The Network project needs to be loaded in the IBH Link S7++/ IBH Link S7++HS and the networked PLC: