Difference between revisions of "IBHLink S7++:Time Synchronisation with NetPro"
From IBHsoftec Wiki English
Line 18: | Line 18: | ||
The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS. | The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS. | ||
− | [[Image: | + | [[Image:MPI_Address.png|537px]] |
[[Image:Ethernet_address.png|548px]] | [[Image:Ethernet_address.png|548px]] |
Revision as of 15:00, 10 December 2012
Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.
Projected Time Synchronisation with NetPro
Within IBH Link setting Routing has to be activated :
The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI®
or Profibus with the PLC.
MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2
The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.
Stellen Sie sicher, dass der angegebene NTP(Network Time Protocol) Server erreichbar ist:
Die Synchronisation muss <auf MPI> als Master aktiviert werden:
In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:
Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen: