IBHLink S7++:Time Synchronisation with NetPro

From IBHsoftec Wiki English
Revision as of 13:44, 10 December 2012 by Axel (talk | contribs) (Created page with " Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS]. ==Proje...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with

Within IBH Link setting Routing has to be activated :


Der IBHLink S7++ / IBH Link S7++HS wird als Station in NetPro angelegt und über MPI bzw. Profibus mit der entsprechenden Steuerung vernetzt. MLFB: 6ES7 412-2EK06-0AB0 V6.0 in Rack 0, Steckplatz 2

Die MPI/Profibusadresse muss der MPI/Profibusadresse des IBHLink S7++ / IBHLink S7++HS entsprechen:

File:MPI Adresse.png


Als IP-Adresse wird die Adresse des IBHLink S7++ / IBH Link S7++HS eingestellt:

File:Ethernetadresse.png

Stellen Sie sicher, dass der angegebene NTP(Network Time Protocol) Server erreichbar ist:

File:NTP Adresse.png


Die Synchronisation muss <auf MPI> als Master aktiviert werden:

File:Uhr Master.png

In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:

File:SCPU Slave.png

Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen:

File:Station laden.png