IBHLink S7++:Time Synchronisation with NetPro: Difference between revisions

From IBHsoftec Wiki English
Jump to navigation Jump to search
No edit summary
No edit summary
Line 27: Line 27:




Die Synchronisation muss <auf MPI> als Master aktiviert werden:
Set the Synchronisation <On the MPI> to Master:


[[Image:Clock_Master.png‎|537px]]
[[Image:Clock_Master.png‎|537px]]

Revision as of 14:04, 10 December 2012


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with NetPro

Within IBH Link setting Routing has to be activated :


The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI® or Profibus with the PLC. MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2

The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.

The selected NTP(Network Time Protocol) Server must be reachable.


Set the Synchronisation <On the MPI> to Master:

In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:

File:SCPU Slave.png

Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen:

File:Station laden.png