Difference between revisions of "IBHLink S7++:Time Synchronisation with NetPro"

From IBHsoftec Wiki English
Jump to: navigation, search
(Created page with " Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS]. ==Proje...")
 
Line 4: Line 4:
 
Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS].
 
Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS].
  
==Projected Time Synchronisation with==
+
==Projected Time Synchronisation with NetPro==
 
Within IBH Link setting Routing has to be activated :
 
Within IBH Link setting Routing has to be activated :
  
Line 10: Line 10:
  
  
Der IBHLink S7++ / IBH Link S7++HS wird als Station in NetPro angelegt und über MPI bzw. Profibus mit der entsprechenden Steuerung vernetzt.
+
The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI®
MLFB: 6ES7 412-2EK06-0AB0 V6.0 in Rack 0, Steckplatz 2
+
or Profibus with the PLC.
 +
MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2
  
 
[[Image:Netpro.png‎|529px]]
 
[[Image:Netpro.png‎|529px]]

Revision as of 14:49, 10 December 2012


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with NetPro

Within IBH Link setting Routing has to be activated :

IBH Link Routing eng.png


The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI® or Profibus with the PLC. MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2

Netpro.png

Die MPI/Profibusadresse muss der MPI/Profibusadresse des IBHLink S7++ / IBHLink S7++HS entsprechen:

537px


Als IP-Adresse wird die Adresse des IBHLink S7++ / IBH Link S7++HS eingestellt:

548px

Stellen Sie sicher, dass der angegebene NTP(Network Time Protocol) Server erreichbar ist:

548px


Die Synchronisation muss <auf MPI> als Master aktiviert werden:

537px

In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:

537px

Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen:

761px