IBHLink S7++:Time Synchronisation with NetPro: Difference between revisions

From IBHsoftec Wiki English
Jump to navigation Jump to search
Created page with " Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS]. ==Proje..."
 
Harald (talk | contribs)
 
(6 intermediate revisions by one other user not shown)
Line 4: Line 4:
Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS].
Projected Time Synchronisation with [http://www.ibhsoftec.com/IBH-Link-S7-PP-Eng IBHLink S7++] or [http://www.ibhsoftec.com/IBH-Link-S7-PP-HS-Eng IBHLink S7++ HS].


==Projected Time Synchronisation with==
==Projected Time Synchronisation with NetPro==
Within IBH Link setting Routing has to be activated :
Within IBH Link setting Routing has to be activated :


Line 10: Line 10:




Der IBHLink S7++ / IBH Link S7++HS wird als Station in NetPro angelegt und über MPI bzw. Profibus mit der entsprechenden Steuerung vernetzt.
The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI
MLFB: 6ES7 412-2EK06-0AB0 V6.0 in Rack 0, Steckplatz 2
or Profibus with the PLC.
 
MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2


[[Image:Netpro.png‎|529px]]
[[Image:Netpro.png‎|529px]]


Die MPI/Profibusadresse muss der MPI/Profibusadresse des IBHLink S7++ / IBHLink S7++HS entsprechen:
The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.
 
[[Image:MPI_Adresse.png‎|537px]]
 


Als IP-Adresse wird die Adresse des IBHLink S7++ / IBH Link S7++HS eingestellt:
[[Image:MPI_Address.png‎|537px]]


[[Image:Ethernetadresse.png‎‎|548px]]
[[Image:Ethernet_address.png‎‎|548px]]


Stellen Sie sicher, dass der angegebene NTP(Network Time Protocol) Server erreichbar ist:
The selected  NTP(Network Time Protocol) Server must be reachable.


[[Image:NTP_Adresse.png‎|548px]]
[[Image:NTP_Address.png‎|548px]]




Die Synchronisation muss <auf MPI> als Master aktiviert werden:
Set the Synchronisation <On the MPI> to Master:


[[Image:Uhr_Master.png‎|537px]]
[[Image:Clock_Master.png‎|537px]]


In der angeschlossenen CPU muss die Uhrsynchronisation wie folgt eingestellt werden:
Within the properties of the networked PLC you have to set up the synchronisation as follows:


[[Image:SCPU_Slave.png‎|537px]]
[[Image:Clock_Slave.png‎|537px]]


Die Projektierung wird in den IBH Link S7++/ IBH Link S7++HS und in die angeschlossene(n) CPU(s) geladen:
The Network project needs to be loaded in the IBH Link S7++/ IBH Link S7++HS and the networked PLC:


[[Image:Station_laden.png‎|761px]]
[[Image:Download_stations.png‎|656px]]

Latest revision as of 11:51, 19 September 2013


Projected Time Synchronisation with IBHLink S7++ or IBHLink S7++ HS.

Projected Time Synchronisation with NetPro

Within IBH Link setting Routing has to be activated :


The IBHLink S7++ / IBH Link S7++HS is engineered as PLC station in NetPro and networked via MPI or Profibus with the PLC.

MLFB: 6ES7 412-2EK06-0AB0 V6.0 Rack 0, Slot 2

The IP and MPI/Profibus addresses need to be set equal to the addresses within the IBH Link S7++ / S7++ HS.

The selected NTP(Network Time Protocol) Server must be reachable.


Set the Synchronisation <On the MPI> to Master:

Within the properties of the networked PLC you have to set up the synchronisation as follows:

The Network project needs to be loaded in the IBH Link S7++/ IBH Link S7++HS and the networked PLC: